Home    About Us    Services    Products    News & Views    Case Studies    Links    Contact Us

 

Wilson Energy News Industry News

September 2009 - Nottinghamshire's Best                

WilSon Energy was voted as Nottinghamshire's best, as we were  finalists in two categories of the Derbyshire and Nottinghamshire Chamber of Commerce business awards. 

The presentation took place at the Nottingham Belfry hotel 

and was hosted by Trent FM's breakfast show duo, Twiggy & Emma. 

"The Green Award" sponsored by the University of 

Nottingham and "Most Promising Business" sponsored by

iogen were two of the eight categories announced.

July 2009 - WilSon Supply 30,000 Meters for Calabar Water Project

The successful supply and delivery of nearly 30,000 domestic 

water meters has been completed by WilSon Energy as two container loads of meters were shipped to Nigeria. As 

previously highlighted in the news section of our web site, a complete new water infrastructure is being installed in the Calabar region of Nigeria, providing fresh drinking water to 

around 29,000 homes, a project which has been funded by the world bank. 

Having already supplied the large bulk water meters for

the monitoring of the service distribution network, the 

company, after submitting various technical submissions

and sample meters, successfully negotiated the contract

 for the supply of domestic household meters, ahead of 

some of the other, world-wide major meter manufacturers.

Each meter produced was customized with the Water 

Company's Logo imprinted on the index cover. For future 

AMR every meter has been pre-equipped with a pulsed 

output facility as eventually the meters will be read remotely, Wilson Energy are at the forefront of this project, having successfully completed trials of our "Drive By" wireless 

AMR system.

Prior to tendering for the next phase of the project the 

company are set to supply a complete test bench to 

enable the water company to offer a test facility to their 

customers.


                   

 

Factory tour with WilSon Energy Directors and 

representatives of the Water Company being 

witnessed by the client, the project consultant and

 utility services before shipment.


Meters for the Calibar project on the test 

bench at the factory.

 

June 2009 - Domestic Contract Awarded

We have recently been awarded another large 

scale domestic project "Thomas Road" in East

 London. Providing an end to end solution, each 

apartment will have an indirect "City" Hydraulic 

Interface Unit installed, to provide heating and hot 

water, together with heat energy meter to record 

the consumption used for billing purposes. A 

domestic cold water meter will also be installed 

on the incoming cold water supply.

A "walk by" wireless data collection system will be 

used to collect data prior to the billing process being 

carried out. Each meter supplied will have a wireless communication module fitted and will be commissioned 

by WilSon Energy's engineering team.

2nd June 2009 - New Arrival

Kimberley Welby is our latest new recruit to join the 

WilSon team. Office based, Kimberley will be carrying 

out administration duties across the business, but in 

particular will support our 'bureau services' division. 

Kimberley is very keen on sports and is an avid fan 

and season ticket holder at Notts County.

1st May 2009 - Engineering Team Expands

In support of additional growth and many new projects 

recently secured, WilSon Energy's engineering team 

continues to expand with the addition of two new 

members of staff. We are pleased to welcome on

board, Jon Gough and Tony Angel, who will assist 

with new installation projects and ongoing maintenance 

contracts, throughout the UK and Europe.


14th February 2009 - Valentines Day is Extra Special

Valentines day was extra special this year for one

member of the WilSon Energy team, as Liz Woollams 

"tied the knot" with fiance Mark Hulse. We wish them 

health, happiness and good luck for their future together.

19th November 2008 - Business Awards Ceremony

We had a great night out at the Newark Business 

Awards and whilst we were delighted and proud to 

be nominated as finalists, sadly we were runners-up 

in both categories. We would like to congratulate all 

of the successful winners and other finalists.

Below are pictures of some of the staff and directors

 enjoying the evening.


 




24th October 2008 - Business Awards Finalists

As reported in the Newark Advertiser, WilSon Energy 

have been nominated as finalists in two categories for

this years Newark Business Awards, "Successful

 New Business" and "Innovation Through Technology". 

The judges will select one winner from  three finalists.

The Directors, staff and partners will attend the black 

tie awards ceremony in November which will be held 

at Kelham Hall. One of the winners from each category 

will be announced as "Business of the Year".

Wish us luck!

29th September 2008 - Engineering Resource Grows

We are delighted to announce the appointment of 

Chris Wayte to the WilSon Energy team. Chris has been 

recruited and  now heads up our installation team. He has 

many years experience working with and installing 

automatic meter reading systems and in particular 

wireless solutions for remote meter data collection.

1st September 2008 - New Sales Staff

James Spowage joins Wilson Energy's "L2 Metering 

Services Division" and will focus on product hardware 

sales. James will  support the sales office, whilst also 

having an external presence visiting existing and new

customers around the Midlands Area.

James, can help with the specification and supply of 

all types of metering equipment used for monitoring 

utilities, so if you need a visit then please do not

hesitate to contact a member of the sales team. 

4th August 2008 - New Corporate Brochure

Our new corporate brochure has just been received  

"hot off the press" from our printers, so to request 

your personal copy please contact our sales office.


16th July 2008 - Royal Visit
HRH The Earl of Wessex on an official visit to the area 

today, visited the Newark Beacon and was shown

the facilities in place by Newark and Sherwood District 

council's economic re-generation manager, 

Mike Robinson. Especially of interest was the green 

credentials of the building, as the Earl also visited the 

plant room where the Bio-Mass boilers are installed.

After the tour HRH was introduced to WilSon Energy's 

Directors; Andy Wilkinson and Stuart O'Neil who gave a 

presentation on Wilson Energy, highlighting the diverse 

range of contracts the company has been involved with 

over the last twelve months. These included local schools 

projects, domestic and industrial sector business and a 

major international contract recently awarded to the 

company.

The Earl was accompanied by, Sir Andrew Buchanan 

Bt, Lord-Lieutenant of Nottinghamshire, Councilor Tony 

Roberts, the leader of Newark and Sherwood district 

council, Councilor Roger Blaney, deputy leader, also of 

Newark and Sherwood District Council and other 

distinguished guests.

 

 

 

  •HRH the Earl of Wessex meets
  with WilSon Energy Directors

  •Viewing of the Beacon
   Bio-Mass Boilers

 

Pictures supplied courtesy of the Newark Advertiser


Back To School

WilSon Energy has been providing service solutions to 

the education sector for both schools and universities.

 

A number of schools on a national basis have embarked 

on the building of new environmentally friendly buildings 

utilising the latest renewable technologies, following the 

guidelines of new schools building program, adapted from 

the latest L2 building regulations.  

 

Wilson Energy have been involved in a number of projects, 

firstly providing a solution of delivering an effective 

metering, monitoring and data collection system, which 

provides key information regarding energy usage and 

consumption. Data is displayed in a child friendly format 

on a large LCD screen, in the reception area of the 

school; this lets the children gain a basic understanding 

of the schools carbon footprint in a simple graphical

format.

 

Recently, WilSon Energy have had the opportunity to 

return to the classroom and deliver a lesson to children 

in a very simplistic format, allowing them to gain a 

basic understanding about energy and the environment, 

but more importantly how to save it. This was fun, 

whilst encouraging interaction from the children with 

child friendly graphics. At the end of the lesson, carried 

out at Coddington Primary School, a competition with 

prizes was ran to see how much was understood by 

the pupils.

 

The company is now offering this as part of their 

service and are looking to expand it across various

educational sectors.

The picture below shows Charlotte Proctor (11) 

with her energy certificate and the winning poster 

entry. She also received a solar powered toy from the 

company as a prize, presented to her, in the Schools 

morning assembly, by the Directors of 

WilSon Energy.




Picture supplied courtesy of the Newark Advertiser

 Your Essential Guide to M&T and aM&T

Don't miss your  essential guide to automatic 

monitoring and targeting. Please click the link 

below for a full presentation on M&T and aM&T.



Large Scale AMR Project for University 

Campus
WilSon Energy has recently been awarded a 

major contract for the supply of a complete AMR 

system for 350 metering points across three university 

sites. The wireless radio system installed is collecting 

data from; electricity, gas, water and heat 

energy meters.
 
I
nformation is transmitted back to several radio 

receivers, where it is then sent by GPRS to host 

servers, where the information is then made available 

on line, through our energy management system. The 

system is independent and operates outside of the 

university's IT infrastructure.

The system will be used for energy and financial 

analysis, reporting (including exception), bench 

marking, bill validation and for the issue of building 

energy performance certificates.

The next phase of the project will include tenant 

billing.


Calabar Water Project
A complete new water infrastructure is being 

installed in the Calabar region of Nigeria, providing 

fresh drinking water to 29,000 homes, a project 

which is funded by the world bank. WilSon Energy 

has recently supplied a quantity of large bulk 

water meters for the monitoring of the 

service distribution network.

Meters were provided for the scheme, in sizes 

ranging from 200mm to 500mm. Both Electro-Magnetic 

and mechanical Woltman type meters have now 

been installed.

 

CLICK HERE FOR ALL WILSON ENERGY NEWS


T: 01636 653 053      F: 01636 653 054      E: Email Us
Registered In England No. 06320941    Registered Office: Wilson Energy Ltd, Synergy House, 3 Acorn Business Park, Commercial Gate, Mansfield, Nottinghamshire  NG18 1EX

© printing.com | www.websitesbyprinting.com